Baytown, Texas

The Problem: Katoen Natie needed a complete re-roof for their warehouse in Baytown. However, they needed a roofing company with the expertise to remove every single layer of built up roof and re-roof each section without exposing the inside of the building to the elements. With only 5 months to complete the entire project, they also needed a roofing company that could work efficiently and within a shortened timeframe.

The Solution: Removing and replacing section by section. Staying on top of weather forecasts. Utilizing our equiptors to easily dispose of materials without leaving a mess. We also carefully folded the EPS before removing it from the job site in order to avoid debris.

What We Did:

  • Initial assessment: carefully inspected the entire roof and took a core sample
  • Demo:
    • remove PVC membrane
    • remove EPS board – this was done with extreme care in order to avoid debris
    • remove gravel to expose the built-up roof
    • break up and remove lightweight insulated concrete
    • remove metal deck
  • Replace metal deck with structural B-deck
  • Install poly-iso insulation
  • Install cover board
  • Apply induction welded TPO

Related Posts